Projects

PROJECT MANAGEMENT

  • Preparation of project strategy plan and project procedures.
  • Participation in contract negotiation and preparation.
  • Contract execution, planning, monitoring, and reporting.
  • Meeting and coordination with client.
  • Direction, control, and coordination of project task force.
  • Budget and expenditure control.
  • Subcontract administration.
  • Project financing administration.
  • Project risk management.
  • Project management consultancy (PMC).


Cost Engineering

Cost Engineering is responsible for cost estimates and control. Cost control utilizes modern software packages, including specialized cost estimation software.


Capabilities in this area cover

  • Investment cost analysis. 
  • Budget development & maintenance.
  • Work breakdown structure. 
  • Expenditure/commitment plan.
  • Contingency and risk analysis.
  • Scope change control.
  • Cost estimating.
  • Project cost trends.
  • Economic analysis.

Process & Flow Assurance

  • Conceptual Design, Process Design Packages (PDP).
  • Debottlenecking and revamps.
  • Process & energy optimization studies.
  • Technologies & License evaluation/ Selection.
  • Front End Engineering Design & Detailed Engineering.
  • Flow assurance & Pressure surge assessment for pipeline.
  • PMC work actives including review of basic engineering for others.
  • Prepare firm Process Design including PFD, UFO, PSD, P&ID, Heat & Martial Balance studies, equipment list, DP/OT, line lists, plot plan and formulation of process design basis, scope of work, operating procedures, process design philosophies (i.e., Isolation, Operating & Control, ESD and Depressurizing).
  • Process equipment sizing and selection including Pump, Compressor, Shell & Tube heat exchangers, Air Cooled heat exchangers, Atmospheric Storage Tanks, column, and separators including two phase separators and three phase separators and generate calculation and datasheets for control instruments & PSV etc.
  • Flare and Relief System analysis and final reporting including reliving scenarios, relief load estimation, blow down calculation, relief system design, relief valve sizing and selection, knock out drum sizing, safety relief valves inlet/outlet & tail pipe/ flare headers line sizing.
  • Perform process simulations and prepare control & safeguarding philosophy, control narrative, C&E diagram and plant operating in addition to Techno Economic feasibility studies preparation including equipment sizing/ log lead items.
  • Preparation of package equipment specifications & technical evaluation of bids and technical recommendation of qualified vendors and preparation of utility summary, chemical summary, and effluent summary.
  • HAZOP, HAZID, QRA, SIL and VE studies.

Past Experience &projects

  • Gas Dehydration Unit (WASCO BP).
  • H2s gas treatment facilities (WASCO BP).
  • Isomerization unit revamp (CORC).
  • HALDA NGL Recovery Plant- CO2 Facilities (PERTOJECT).
  • CO2 Pipeline (WASCO).
  • Installing a new Compression Station (Dana Gas).
  • Increase SAHEL Pipelines Capacity (PERTOJECT).
  • Gas Flow Capacity Revamp Project (WASCO BP).
  • Vapor Recovery Unit for Cairo oil refining company Plant (CORC).
  • Enhance LPG Piping Network -BADER ALDEN NGL Fractionation Plant (BP).
  • Tanta wastewater treatment unit modification - (TCORC).
  • Installing Viscosity Improving Unit and two storage tanks (Total).
  • Installing a new Compression Station phase 01 (Dana Gas).
  • Installing a new Compression Station phase 02 (Dana Gas).
  • Installing a new Compression Station phase 03 (Dana Gas).
  • Lubricant Oil Plant Revamp (CORC).
  • Tanta wastewater treatment unit modification - (TCORC).
  • ZOHA Gas Plan (ZOHR).
  • Revamp El- wastani Gas Plant (BP).
  • Water treatment unit (BP).
  • Oily water separator for ethylene oil water sewer- (CORC).
  • MUSTARD distillation unit revamp phase 01- (CORC).
  • MUSTARD distillation unit revamp phase 02- (CORC).
  • Isomerization unit revamp (CORC).
  • Update operating manual (ARAMCO).
  • Update 3D Module (ARAMCO).